In the operation of high speed fine high speed punch, it is difficult to avoid some common failures. Do you understand the common failures and removal of high-speed gantry punch manufacturers? Let's follow me to a simple master look!


1. Disengage from the left and right clamping die after closing: when the left and right clamping die disengage from the slider and interrupt the position, please disengage according to the following method and disengage from the cooperative disengaging method.


1. It must be clear whether the engine crankshaft orientation is before or after BDC.


2. The standard air pressure of clutch is adjusted to 4-5, 5kg/cm2.


3. After the BDC, the motor can rotate in the original correct direction. If before the bottom dead center of the automatic punch press, the connection side of the motor must change the opposite direction, so that the motor turns over.


4. The starting motor drives the belt disc to high speed, and then it turns quickly.


5. Switch the operation power switch to point operation, then press and release the operation knob switch. Precision high-speed punch manufacturers repeatedly operate several times, the slider will rise to the starting point of azimuth.


Two, high speed fine high-speed punch with overload safety protection of the device to escape the method (steam pressure limit overload insurance device) :


1. Switch the check valve in the overload equipment line to make the gasoline pump inoperable.


2. Overload the anchor bolt of the oil passage of the safety protection equipment before pulling out the slider, so that the oil can be discharged and the internal working pressure can be reduced. Then fix the anchor bolt in time.


3. The starting motor drives the pulley block at high speed, and then it runs at high speed.


4. Switch the operation power switch to point operation, then press and release the operation knob switch. In case of clutch failure, transfer the overload power switch to the calibration position, and then press and release the knob switch continuously to raise the slider to the starting point.


5. After the upper die and upper die are tightly connected and loose, open the check valve power switch in the pipeline of the overload equipment. The calibration operation sequence is the same as that of the overload safety device, and all normal operation can be carried out.